From the superyachts making waves at Monaco to the estates redefining luxury living in Palm Beach, the automotive debuts turning heads in Geneva, and the artists commanding record prices at auction — Elevated Magazines captures the luxury lifestyle stories, brands, and cultural moments that have the world's most discerning audiences talking right now.

Why Winter Is the Smartest Time to Plan a Spring Remodel

5 hours ago
5 min read

Most homeowners start thinking seriously about a remodel when the weather turns nice. They make a few calls in March, expecting crews on site by April. What usually happens instead is a summer start, or a fall one.

The reason isn't lazy contractors. It's that the longest parts of a remodel happen before anyone swings a hammer. If you want construction underway this spring, the time to start is now, while the holiday lights are still up.

Here's what fills those months, and how to use winter to get ahead of it.

The part of a remodel nobody sees takes the longest

On a typical project, the design stage alone takes at least a couple of months. That surprises people, until they see how many decisions are involved.

A detailed remodel can mean choosing 50, 60, even 100 separate items: tile, faucets, cabinet hardware, light fixtures, flooring, paint colors, appliances. Each one has to be specified, priced and sourced, and someone has to find out how long it takes to arrive. Only once every item is pinned down can a contractor order materials, submit permits and line up trades.

The scale of the project changes the math. Updating a single bathroom or kitchen typically runs six to ten weeks of construction. A whole-home renovation, an addition or anything structural can easily stretch to three, four or five months on site — and the planning ahead of it grows to match.

Rushing this stage doesn't save time. It moves the delays into construction, where they cost more. The most common mistake I see is homeowners who start building before the project is fully planned. People walk into our showroom mid-construction asking for cabinets they haven't chosen yet. If you don't know what you need, you can't know how long the job will take or what it will cost. My number one piece of advice: plan the entire thing, A to Z, before you start.

Permits run on the building department's clock

Once the design is set, it goes to the city. In parts of the Pacific Northwest, including Seattle and Bellevue, permitting is stringent. Approvals for larger projects can take months.

Most remodeling work needs a permit — not just additions, but window changes, electrical and plumbing too. The permit also isn't the finish line. During construction, inspectors check framing, insulation, drywall, rough electrical and plumbing, and HVAC before each next step can begin. Those inspections belong in the schedule from day one.

You can't make a building department move faster. You can submit sooner. A permit application filed in January is in a very different position in April than one filed in March.

Lead times set your start date

This is the factor homeowners underestimate most. Some materials take 5 - 10 weeks to arrive after they're ordered. Custom cabinets, specialty windows and certain tile and plumbing fixtures are the usual suspects.

A good contractor won't start demolition and then wait for parts. When the design-build team at Armada schedules a kitchen, we work backward from the materials. Say the cabinets go in during week five of construction, but the manufacturer needs ten weeks to build them. Then construction shouldn't start until at least five weeks after the cabinets are ordered. Starting earlier just means a torn-out kitchen sitting idle.

That's why ordering is the real starting line for a spring project. To have cabinets in hand by April, the order needs to go in around the turn of the year — which means the design has to be finished before then.

Winter has its own advantages

In the Northwest we build year-round. Winter is wetter, and crews avoid leaving a roof open in the rain when they can. Exterior work and anything that opens up the house is generally easier in drier months.

Interior projects are another story. Kitchens, bathrooms and finished basements barely care about the weather. Trades are often easier to book in winter, too, because so many of them spend summer chasing outdoor jobs. Whether you plan in winter and build in spring, or start an interior project right away, the colder months work in your favor.

Use winter to make the hard decisions

Planning early also gives you time for the questions that are hard to answer under pressure.

Can you live at home during the work? It depends on the scope. When people ask me, my answer — usually with a little humor — is: how much do you like camping? Without a working kitchen or bathroom, home can start to feel like a campsite. On a kitchen remodel, a temporary kitchen in another room can help: the fridge, a microwave, a few salvaged cabinets with a plywood top. On a house with several bathrooms, a good contractor renovates them in stages so you always have one that works. If none of that is realistic for your family, winter is the time to arrange somewhere else to stay.

Where will everything go? New cabinets, lumber, flooring and fixtures need dry storage before installation. In a rainy climate, that often means giving up a garage stall for a few weeks.

How much cushion do you need? Almost no renovation goes exactly as planned. Opening a wall can reveal outdated wiring, plumbing that has to be rerouted or water damage nobody could see. In the Northwest we often find old leaks and dry rot. Plan on access to an extra 10 to 15 percent of the project cost. If your home is 50 years old or more, assume you'll use some of it.

What does the schedule actually look like? Ask any contractor you're considering for a written, step-by-step schedule. That means days for demolition, drywall, paint, tile and inspections, plus how changes will be handled if something comes up. Some contractors work from a detailed schedule; others work from memory. Know which you're hiring.

A simple winter timeline

If you're aiming for a spring start, here's a rough way to think about the next few months:

  • November–December: Define the scope and your priorities. Set your goals of what you need and what you want for your project. Interview contractors and choose one.

  • December–January: Finalize the design and every selection. Order long-lead items. Submit permit applications.

  • February–March: Confirm delivery dates and the construction schedule. Prepare the house: storage, a temporary kitchen, plans for where you'll live.

  • Spring: Start construction with materials on the way and a schedule that holds.

Every project is different, and your timeline will depend on your home, your city and the scope of work. But the homeowners whose projects start on time have one thing in common: they did the planning while everyone else was waiting for spring.

 

About the author. Charlie Carter is Principal Project Consultant at Armada Design & Build, a design-build remodeling firm in Bellevue, Washington, and host of the "Let's Build with Armada" podcast. He helps Seattle-area homeowners plan kitchens, bathrooms, additions and whole-home remodels from first sketch to final walkthrough.

 